

-1691658667.jpg)
Dendermonde
The architectural firm Quisquater called on our expertise for the drying of the offices and apartments in this new construction project. The building could not be heated yet and within a month, parquet flooring, doors and furniture had to be installed here. According to the architect, the temperature in the building definitely needed to get up to 20° C and plaster and screed could be dried more quickly.
By using a few DF400 in combination with the powerful TTV4500 fans and electric heaters of the DFE25 type, we were able to provide clean, dry and odourless warm air. We wish Architectenbureau Quisquater good luck and job satisfaction at their new site. And for anyone who might still be looking for a handsome new-build apartment that’s been finished to perfection…. www.immotijl.be
.jpg)
Odour control
Are you suffering from air pollution in your home or business? Ozone generators allow odour components and other air pollutants to be efficiently decomposed at molecular level.
Read more >

Building dryer: low temperatures
It is a myth that building dryers work less efficiently at lower temperatures. What is true is that building dryers thrive, and therefore perform optimally, in warmer environments.
Read more >
.jpg)
Painting after drying
The plastering phase of your project is almost completed. Now is the time for efficient drying of the plasterwork. One address: Buildingdryers.be!
Read more >
.jpg)
Odour eliminators
Does your home have an unpleasant odour? Or do you need an air purifier at your place of business?
Read more >

Practical tips
With natural drying it is difficult to estimate the length of the drying process, but also with building dryers it is virtually impossible to determine the exact drying time. In general.
Read more >
Stockroom
Provincialeweg 1
2890 Puurs-Sint-Amands
(Enter in Google Maps)
REGISTERED OFFICE
Houtenmolenstraat 69B
B-9255 Buggenhout
BTW BE0886.987.301
KBC BE57 7370 2003 9435
0476/20.41.56
info@bouwdroger.com