It was looking uncertain that the deadline for finishing this residential care centre would be met. On one hand, the plastering and screed were still too wet, and also, the inside temperature needed to be at least 15C° for the PVC flooring to be laid.
The request for the quote came in on Monday afternoon. We visited the worksite an hour later, and everything was installed the following day. Since there wasn't enough power available at the worksite to heat it electrically, they chose the solution of an indirect fired heater Master BV690FS (220Kw) and a 1200L fuel oil tank. For the drying, eight DF800 industrial dehumidifiers were provided in combination with eight powerful TTV4500 fans.
Industrial dust extraction
One of the most important ways to quickly and efficiently neutralise construction and refurbishing dust and dirt is good Industrial dust extraction. The Trotec TAC series is your lifesaver!
Read more >
Dust extraction
Construction or renovation and dust go hand in hand. But that does not mean that you or the people on your worksite have to breathe in dust the whole time.
Read more >
Building dryer: fire damage
Using a building dryer is recommended in the event of damage caused by extinguishing water. Not only will the fire itself have caused significant damage to your home.
Read more >
Odour eliminators
Does your home have an unpleasant odour? Or do you need an air purifier at your place of business?
Read more >
Laying parquet
Your building project is finally coming to an end. Are you planning to install parquet flooring? Then make sure that the screed has fully dried out.
Read more >
Stockroom
Provincialebaan 152
9255 Buggenhout
REGISTERED OFFICE
Provincialebaan 152
9255 Buggenhout
BTW BE0886.987.301
KBC BE57 7370 2003 9435
0476/20.41.56
info@bouwdroger.com