

Vanden Avenne in Buggenhout
The Red Cross had this new storage facility built in order to store blood. The floor here still needed to be given a seamless coating with an epoxy floor = a seamless poured floor. Since the concrete here was still too wet, 3 DF800 industrial dehumidifiers were installed together with 6 TTV4500 fans. The concrete floor was completely dry in 14 days and they were able to continue with the finishing work. We would like to express our thanks again to the Red Cross, because after all, they provide a continuous supply of safe blood products to most of our hospitals in Flanders.
Industrial dust extraction
One of the most important ways to quickly and efficiently neutralise construction and refurbishing dust and dirt is good Industrial dust extraction. The Trotec TAC series is your lifesaver!
Read more >
Painting after drying
The plastering phase of your project is almost completed. Now is the time for efficient drying of the plasterwork. One address: Buildingdryers.be!
Read more >
Building dryer: water damage
Using a building dryer is essential when your home has fallen prey to water damage. If you fail to do so, the consequences can be serious.
Read more >
Building dryer and fan
Hiring a building dryer is interesting for those who want to finish their home. It will save you time and also the stress that is associated with lack of time.
Read more >
Dust extraction
Construction or renovation and dust go hand in hand. But that does not mean that you or the people on your worksite have to breathe in dust the whole time.
Read more >
Stockroom
Provincialebaan 152
9255 Buggenhout
REGISTERED OFFICE
Provincialebaan 152
9255 Buggenhout
BTW BE0886.987.301
KBC BE57 7370 2003 9435
0476/20.41.56
info@bouwdroger.com